New units for fuel oil reduction, Muskiz, Biscay, Spain. New coker unit and coker storage (not in [+]
Aceca combined cycle thermal power plant




- Client: UNIÓN FENOSA GENERACIÓN UNIÓN FENOSA
- Country: Spain
- Start date: 2003
- Ending date: 2006
Aceca combined cycle thermal power plant (Toledo, Spain).
The combined cycle power station at Aceca (Toledo) for Unión Fenosa Generación is designed in the single-axis arrangement, with a nominal power of 400 MW and tower cooling. Condenser by FOSTER WHEELER.
The power station was built in EPC mode by a consortium (TJV) formed by SENER, GE Energy and ACS.
Additionally, SENER carried out all the engineering tasks, both basic and detail, and the purchase management and drawing up of the documentation required for commissioning and Start-up.
- Project data:
- Power: 400 MW.
-
Type: 1x1x1 (single shaft).
-
-
Contract type: EPC.
-
-
Partners: ACS and GE Energy.
Other programs
See allIsomerisation unit U-618 for the Repsol refinery T-46, Tarragona, Spain. Revamping of the isopentane unit for [+]