Alpek Cogeneration Plant










This 95 MWe CHP plant is comprised by two (2) GE (LM 6000) Gas Turbines, associated HRSGs and one (1) Steam Turbine of 4 MW of power, and 130 tons of steam per hour, as main equipment. The works of SENER and its partner Schrader Camargo also cover basic engineering, detail engineering, procurement management, construction and start up of the installation in the turnkey mode.
General data:
- Location: Consoleacaque, Veracruz
- Client: TEREFTALATOS MEXICANOS (Grupo Alfa)
- Contrato type: EPC
- Investment (MUS$): 129
- Engineering manpower (mh): >115.000